Order versus quotation

Before production, the buyer and manufacturer must agree on product lines, commercial conditions and acceptance criteria.
Ten contractual fields
Check the legal parties; diameter and tonnes per size; material grade and approved specification revision; unit price, currency and total; Incoterms and named place; packaging and markings; payment milestones; production and shipment dates; sampling, inspection and acceptance; invoice, packing list, certificates and transport documents.
Diameter-by-diameter schedule
Before production, the buyer and manufacturer must agree on product lines, commercial conditions and acceptance criteria.
| Diameter | Grade | Tonnes | Shipment |
|---|---|---|---|
| _____ | _____ | _____ | _____ |
| _____ | _____ | _____ | _____ |
| _____ | _____ | _____ | _____ |
Acceptance and documents
An approved sample does not automatically approve every production batch. Define inspection method, sample size, timing, and dispute handling in writing.
Change control
Changes to grade, diameter, tonnage, delivery point or dates require written agreement before altering the production plan.
FAQ
Can one order include several diameters? Yes, as separate line items. Is container loading always 25 tonnes? No; confirm route and carrier limits. Does CIF include import duties? Not merely by being CIF.
Request a quotation
Send required diameters, tonnes per diameter, specifications, destination and schedule.