Samples can help a mine buyer verify nominal diameter, measured dimensions, surface condition, material identity and agreed laboratory tests. A sample is not evidence that every future production batch will perform identically in a particular mill.
What sample approval can establish
Check the actual measured diameter against the agreed tolerance, and compare chemical analysis, surface and core hardness or impact-test results only where the purchase specification requires them. Record test method, sample identification, equipment and laboratory conditions. A result without a method and acceptance limit is difficult to interpret.
What a sample cannot establish
Small samples cannot establish plant-scale consumption in kg per tonne of ore, mill throughput, long-term breakage or corrosion performance. Such outcomes depend on ore, water chemistry, mill conditions and the observation period. Do not turn a sample pass into a guaranteed wear-rate claim.
Agree acceptance criteria before ordering
Before purchase, agree the grade, each diameter and tonnage, tolerance, sampling frequency, test method, acceptance limits, packaging, inspection documents and process for nonconforming results. Specify whether third-party inspection is required and who bears its cost.
Connect sample and production batch records
Ask the supplier to connect the approved specification with the commercial order: heat or material lot identification where applicable, chemistry records, dimensional checks, hardness test reports, batch or packing identification and shipment documents. Sample and commercial batches may be different; traceability supports verification rather than proving identical results.
First-order handover checklist
Buyer checklist: (1) approved sample ID and test report; (2) agreed drawing/specification revision; (3) diameter and tonnes per diameter; (4) quality acceptance and inspection plan; (5) packaging and lot marking; (6) Incoterms and named place; (7) payment and delivery schedule; (8) documents required before dispatch.
FAQ
Can a sample pass guarantee mill performance? No; a plant trial under defined conditions is needed to assess site performance. Must every shipment repeat every sample test? Only the agreed inspection plan defines that. What should a buyer send for a first order? The approved specification, diameters, tonnes for each diameter and delivery terms.
Forged steel grinding balls · Factory and quality control
For a quotation, send the required diameters and tonnage for each diameter.